ACG Parnell Early Learning School

ACG Parnell Early Learning School using Direct Fix Focus and CMax Absorb Ceiling Tiles. (Mark Scowen Photography)

The ACG Parnell Early Learning School project featured our Direct Fix Focus Panel and C Max Absorb Ceiling Tiles. 9mm Direct Fix Focus was installed on the ceiling of the nursery room, cut as triangles in Concrete Marble, and CMax Absorb Ceiling Tiles installed in the preschool internal playground. The spaces required to be acoustically sound for the children aged three months to five years. 

 

Thoughtfully designed by Fat Parrot Architecture and photographed by Mark Scowen. 



 
 
 

  Daiken CBI Gridlux
 
© 2020 T&R Interior Systems | Site by 3Rings